Nigeria’s burgeoning population, urbanization, and evolving consumer preferences have fueled the demand for wheat flour-based products.
Key Features
- An overview of the regulatory environment governing the wheat flour production industry in Nigeria is outlined. Key regulations, licensing requirements, and compliance standards are discussed to ensure adherence to legal and operational guidelines.
- The technical feasibility of establishing a wheat flour production plant is assessed, considering factors such as site selection, plant layout, machinery requirements, production process, and quality control measures. Recommendations for technology adoption and operational efficiency are provided to optimize plant performance.
- A comprehensive financial analysis is conducted to evaluate the economic viability of the proposed wheat flour production project. Key financial indicators, including investment costs, operational expenses, revenue projections, and return on investment (ROI), are analyzed to assess profitability and financial sustainability.
- And more…
The Flour Mill has the capacity to produce flour approximately 4,320 tons annually and will operate for 330 days a year, 8 hours a day.
Click the ADD TO CART button to obtain the full pre-feasibility report.
Table of Contents
1 EXECUTIVE SUMMARY 5
2 PURPOSE OF THE DOCUMENT 6
3 BRIEF DESCRIPTION OF PROJECT & PRODUCT 7
4 PRODUCTION PROCESS 8
4.1 FLOUR PRODUCTION PROCESS FLOW 8
4.1.1 Intake Hopper 8
4.1.2 Drum Sieve Machine 9
4.1.3 Grain Cleaner 9
4.1.4 Verm Conveyor 9
4.1.5 Separator cum De-stoning Machine 9
4.1.6 Scouring Machine 9
4.1.7 Intensive Dampner 10
4.1.8 Verm Conveyor 10
4.1.9 Scouring/Brush Machine 10
4.1.10 Seed Cleaner 10
4.1.11 Roller Mill 10
4.1.12 Plan Sifter (sieve) 10
4.1.13 Packaging & Dispatching 11
5 INSTALLED AND OPERATIONAL CAPACITIES 11
6 CRITICAL FACTORS 11
7 GEOGRAPHICAL POTENTIAL FOR INVESTMENT 11
8 POTENTIAL TARGET CUSTOMERS / MARKETS 12
9 PROJECT COST SUMMARY 12
9.1 PROJECT ECONOMICS 12
9.2 PROJECT COST 14
9.3 SPACE REQUIREMENT 14
9.4 MACHINERY & EQUIPMENT REQUIREMENT 15
9.5 FURNITURE & FIXTURES REQUIREMENT 17
9.6 OFFICE EQUIPMENT REQUIREMENT 17
9.7 HUMAN RESOURCE REQUIREMENT 17
9.8 UTILITIES AND OTHER COSTS 18
9.9 REVENUE GENERATION 18
10 CONTACT DETAILS 19
10.1 MACHINERY SUPPLIERS 19
11 ANNEXURES 21
11.1 INCOME STATEMENT 21
11.2 BALANCE SHEET 22
11.3 CASH FLOW STATEMENT 23
12 KEY ASSUMPTIONS 24
12.1 OPERATING COST ASSUMPTIONS 25
12.2 PRODUCTION COST ASSUMPTIONS 26
REVENUE ASSUMPTIONS 27